What Are Facility Inspection Requirements Under SPCC Rule?
The SPCC Rule requires that at a minimum monthly inspections be conducted and documented. Various provisions of the SPCC rule relate to the inspection, evaluation, and testing of containers, associated piping, and other oil-containing equipment. Different requirements apply to different types of equipment, oil, and facilities. The requirements are generally aimed at preventing discharges of oil caused by leaks, corrosion, brittle fracture, overfill, or other forms of container or equipment failure by ensuring that containers used to store oil have the necessary physical integrity for continued oil storage. The requirements are also aimed at detecting container and equipment failures (such as pinhole leaks) before they can become significant and result in a discharge as described in §112.1(b). For certain above ground tanks, these monthly inspections can be used in lieu of more extensive tank inspections and integrity testing by a certified tank inspector.Cracked Secondary Containment
Dike Around Oil Tank