Showing posts with label Kansas. Show all posts
Showing posts with label Kansas. Show all posts

Thursday, November 23, 2017

State Spill Plan, SPCC Plan, Contingency Plan Requirements

Caltha LLP maintains a library of SPCC Plan Templates developed to meet the above ground tank and spill prevention and response requirements of individual States and the Federal SPCC Rule. An SPCC Plan is require for any facility that exceeds an oil storage capacity of 1,320 gallons. Facilities potentially subject to the SPCC Rules (40 CFR 112) are not limited to industrial sites, but can include municipal, commercial, retail, institutional sites, construction sites, and even farms.

Leaking Fuel Tanks And Refueling Area 
Without Properly Sized Secondary Containment


The revised SPCC Rule now allows the use of streamlined SPCC plan formats if facilities meet certain criteria. These streamline SPCC Template plans do not need to be signed by a professional engineer in most States. Other SPCC plans may need to be reviewed and signed by an engineer. Caltha LLP also provides SPCC training for companies subject to the SPCC Rule and conducts SPCC inspections.


Caltha prepares SPCC Plans for the following States: [Click on a State to request information and options]
Alaska SPCC Plan
Arkansas SPCC Plan
California SPCC Plan
Connecticut SPCC Plan
Florida SPCC Plan
Georgia SPCC Plan
Illinois SPCC Plan
Indiana SPCC Plan
Iowa SPCC Plan
Kansas SPCC Plan
Kentucky SPCC Plan
Louisiana SPCC Plan
Maine SPCC Plan
Massachusetts SPCC Plan
Michigan SPCC Plan
Minnesota SPCC Plan
Mississippi SPCC Plan
Nebraska SPCC Plan
Nevada SPCC Plan
New Jersey SPCC Plan
New York SPCC Plan
North Carolina SPCC Plan
North Dakota SPCC Plan
Ohio SPCC Plan
Oklahoma SPCC Plan
Oregon SPCC Plan
Pennsylvania SPCC Plan
South Carolina SPCC Plan
South Dakota SPCC Plan
Tennessee SPCC Plan
Texas SPCC Plan
Utah SPCC Plan
Virginia SPCC Plan
Washington SPCC Plan
Wisconsin SPCC Plan

Monday, October 2, 2017

Warehousing and Logistics Facilities Needed Storm Water Permit And SWPPP


Caltha LLP Project Summary

Project: Industrial Storm Water Permitting & Compliance
Client: International Retailer
Location(s): California, Washington, Utah, Georgia, Florida, Virginia, North Carolina, Pennsylvania, Ohio, Massachusetts, New York, Kansas, Virginia, Louisiana, Texas, Tennessee, Minnesota, Illinois, Indiana, South Carolina, Colorado, Nevada, New Jersey, Connecticut, Missouri

Key Elements: SWPPP preparation, Stormwater monitoring, Compliance plan, Permit application

Overview: Caltha LLP has provided consulting services to this international retailer at multiple logistics and warehousing locations to comply with individual State industrial stormwater rules. Services included preparing facility stormwater pollution prevention plans, preparation of State or EPA application forms (Notice of Intent), preparation of site-specific inspection checklists to comply with individual State inspection requirements, preparation of site-specific stormwater monitoring and benchmark monitoring plans to meet State requirements applicable to this industrial sector. Caltha then provided ad hoc technical support to facilities to address questions during roll-out of the compliance programs.

Leaking Hydraulic System On Trash Compactor 
Contaminates Stormwater Discharge


For more information on Caltha LLP SWPPP services, go to the Environmental Health & Safety Plan | Spill Plan Information Request Form.


Monday, September 25, 2017

New Kansas Industrial Discharge Permit

The Kansas General Permit for Stormwater Runoff Associated with Industrial Activities became effective on November 1, 2016. The reissued permit and forms contain new and additional requirements.


Owners or operators of new or existing unpermitted facilities subject to regulation of stormwater runoff must complete the new Notice of Intent (NOI) form to apply for and obtain coverage under the industrial stormwater general permit S-ISWA-1611-1.
Facilities that currently have industrial stormwater discharge coverage under the previous Kansas General Permit do not need to submit a new NOI, but need to comply with the requirements of the new general permit. Existing permitted facilities that wish to decline coverage under the new permit must submit an application for coverage under an individual permit by February 1, 2017 and must continue to comply with the conditions of the previous general permit until the individual permit is issued.


The principal requirement of the Kansas General Permit for Stormwater Runoff from Industrial Activity has remained the same - for the owner to develop, implement and maintain a Stormwater Pollution Prevention Plan (SWPPP). Caltha LLP has prepared a SWPPP Template to align with the 2016 Kansas permit requirements.


For more information go to Caltha Stormwater Services